Major Projects

2006 400kV Transmission

Hendrina Vulcan #2 400kV Transmission Line Deviations

Principal contractor for deviation works, including changes to two bays and related installation requirements.

View Project
2006 275kV Transmission

Atlas Snowdon 1 & 2 to Atlas-Scafel and Everest 275kV Transmission Line

Eskom upgrade project delivered with Mkhulu Electro Distribution Projects CC as the main contractor.

View Project
2007 765kV Transmission

Mercury Perseus 765kV Transmission Line

Delivered for Eskom PDP, with Viscas Corporation as principal contractor and Mkhulu as subcontractor.

View Project
2009–2010 765kV Transmission

Hydra Gamma 1 & 2 765kV Transmission Line

Completed for Eskom with Mkhulu Electro Distribution Projects CC as subcontractor.

View Project
2009–2010 765kV Transmission

Hydra Perseus B 765kV Transmission Line

Executed for Eskom PDP to strengthen regional transmission capacity.

View Project
2011–2012 275kV Upgrade

Ferrum Deviation 275kV Transmission Line

Upgrade and deviation works supporting the Ferrum substation transformation.

View Project
2011–2013 400kV Transmission

Ferrum–Mookodi 400kV Transmission Line A and B

Major Eskom PDP project completed with Mkhulu as prime contractor.

View Project
April 2014 533kV Transmission

Apollo–Cahora Bassa 533kV Transmission Line

Delivered for Hydro de Cahora Bassa, with Mkhulu as subcontractor.

View Project
2014–2015 400kV Deviation

Duvha–Kusile 400kV Transmission Line Deviation

Strategic deviation works completed to support infrastructure development.

View Project
2014–2015 765kV Transmission

Kappa–Sterrekus 765kV Transmission Line

Major Eskom PDP project delivered with Mkhulu as prime contractor.

View Project
May 2015 400kV Line Lift

Duvha–Kendal 400kV Transmission Line Lift

Lift works completed to increase line clearance above the new Kusile Road.

View Project
2016–2018 400kV Transmission

Everest–Merapi 400kV Transmission Line

Executed for Eskom PDP with Mkhulu as prime contractor.

View Project
2016–2018 765kV & 400kV

Masa Ngwedi 765kV & 400kV Transmission Line 1 & 2 (Section E)

Construction of parallel 765kV and 400kV line sections near Mogwase.

View Project
2017–2018 400kV Double Circuit

Ankerlig–Sterrekus 400kV Double Circuit Transmission Line

Commissioned by Eskom PDP and delivered with Mkhulu as main contractor.

View Project
2019 400kV Lines

Medupi Loop In & Out 400kV Lines

Fast-turnaround project carried out for Eskom PDP, with Mkhulu as main contractor.

View Project
April 2019 Emergency Recovery

Apollo–Cahora Basa Emergency Tower Recovery

Emergency recovery works initiated in 2019, with Mkhulu as principal contractor.

View Project
2019–2020 765kV Refurbishment

Alpha Beta 1&2 & Hydra-Perseus 1 765kV Transmission Lines

Anchor refurbishment works to improve the structural integrity of 50 towers.

View Project
2019–2021 132kV Transmission

Matsoku to Polihali 132kV Transmission Line and Upgrade

Delivered for the Lesotho Highlands Development Authority.

View Project
2019–2021 400kV Transmission

Medupi Borutho 400kV Transmission Line (Section A)

Construction of a 25km segment connecting Medupi Power Station to Borutho Substation.

View Project
2019–2020 Emergency Works

Hydra Perseus 1 765kV Line (Emergency Work)

Emergency recovery and 400kV bypass construction delivered in collaboration with Eskom PDP.

View Project
2020–2021 400kV Transmission

Kusile Lulamisa 400kV Transmission Line (Section A)

A 77km Section A build executed in partnership with Eskom PDP.

View Project
2021 765kV Transmission

Masa Ngwedi 1&2 765kV Transmission Line (Section C)

Approximately 40km of 765kV transmission line works delivered for Eskom PDP.

View Project
2021 765kV Transmission

Masa Ngwedi 1&2 765kV Transmission Line (Section D)

Delivered for Eskom PDP as part of a major high-voltage infrastructure programme.

View Project
07/2024 – 02/2025 400kV LILO & OPGW

Aquila LILO Hydra – Poseidon 2 (Koruson) 400kV Line

Civil and electrical works, including commissioning, relating to the new MTS Aquila connection through Loop In and Loop Out to the existing Hydra Poseidon 400kV line. The scope also included 160km of OPGW stringing under a Procurement and Construct contract.

Client: Proconics Headquarters

View Project
05/2025 – 07/2025 765kV Emergency Repair

Alpha Beta 1 765kV Emergency Repair

Temporary and permanent restoration works. The temporary restoration included building a bypass from Line 1 to Line 2 at Beta Substation to connect to Bay 1. The permanent solution included replacing the collapsed structures with new 702B structures.

Client: Eskom SOC Holdings Ltd

View Project
10/2025 – In Progress 400kV Transmission

Ferrum Upington 1st 400kV Line Project – Section A

Line construction of Section A and associated works for 130km of the 400kV line, including a 400kV feeder bay at Ferrum Substation. The works include verification of designs, equipment procurement, construction management, and commissioning.

Client: Eskom SOC Holdings Ltd

View Project
02/2026 – In Progress 765kV Transmission

Perseus – Zeus 765kV Line Section B

Construction of a new 113km Section B single-circuit overhead transmission line between Tower 263 and Tower 526 near Virginia and Edenville in the Free State. The works form part of the overall 434km Perseus–Zeus 765kV transmission line and include standard 765kV lattice towers, six Tern ungreased conductors, and glass insulators.

Client: Eskom SOC Holdings Ltd

View Project
02/2026 – In Progress 765kV Transmission

Perseus – Zeus 765kV Line Section C

Construction of a new 108km Section C single-circuit overhead transmission line between Tower 526 in Edenville, Free State, and Tower 778 near Copperville in Gauteng. The works form part of the overall 434km Perseus–Zeus 765kV transmission line and include standard 765kV lattice towers, six Tern ungreased conductors, and glass insulators.

Client: Eskom SOC Holdings Ltd

View Project
02/2026 – In Progress 400kV OPGW

Drakensberg – Venus 400kV Line OPGW

Design, engineering, procurement, manufacture, supply, delivery, construction, installation, testing, and commissioning of an approximately 91km OPGW link. The works include replacing existing earth wire, installing joint boxes, and associated civil and access works.

Client: Eskom SOC Holdings Ltd

View Project
Recent 132kV Transmission

Construction of Kappa Oya 132kV Line

Construction of 33km of 132kV line, including surveying, foundations, assembly, and erection.

View Project
Recent Substations

Construction of Oya Electrical Balance of Works – Substations

Collector stations, hybrid station, feeder bay works, and associated civil works.

View Project
Recent 400kV Transmission

Aries Upington 400kV Transmission Line Section B

Construction of 72km of 400kV line, including surveying, foundations, and assembly.

View Project
Recent 400kV Substation

Upington 400kV Substation

Full civil and electrical works, including commissioning, under a procurement and construct contract.

View Project
Recent Loop In / Loop Out

Aquila MTS Loop In & Loop Out & OPGW Works

Civil and electrical works, including commissioning, for the Aquila connection.

View Project